Case · brand site / creative dev / 2026

VOLT — A living circuit for an electrical installation team

VOLT is the site of an electrical installation team: wiring, panels, lighting, power and preparation for solar.

At its centre is a Living Circuit, an axonometric plan of a room whose layers — routes, panel, lighting, sockets, grounding — draw themselves as you scroll.

Eight scenes take a visitor from what the team does, through how an installation is built step by step, to a quick estimate and a request with photos attached.

Thirteen service pages, a process page and a full request form complete it.

Product & services
  • Creative direction
  • Scroll-driven animation
  • Service pages
  • Request flow with uploads
  • Lead API
Year
2026
VOLT home with the Living Circuit plan

Context

The challenge

Online, electrical work all looks the same: stock photos of cables and a phone number.

The team needed to show competence and order — that they plan before they drill — without inventing projects or prices they could not stand behind yet.

Solution

The approach

The work itself became the visual: the circuit is the brand, and every section lights its own layer. Requests go through one adapter, so connecting a CRM later means replacing one file; the motion respects reduced-motion settings and the site works without it.

VOLT

Screenshots

VOLT build sequence, stage 06: testing and launch
VOLT service catalogue
VOLT cost request form